Viessmann VITOTRONIC 100 GC1B Operations Instructions Page 99

  • Download
  • Add to my manuals
  • Print
  • Page
    / 184
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 98
99
Directives
Regulations
Carry out the power supply connection
and all earthing measures (i.e. RCD cir-
cuit) in accordance with IEC 60364, the
requirements of your local power supply
utility, and VDE or national regulations.
Protect the power cable to the control
unit with an appropriate fuse/MCB.
For oil and gas combustion equipment
over 100 kW, according to the Sample
Combustion Ordinance "FeuVO", an
"emergency shutdown" must be installed
on site outside the installation room. The
national combustion equipment ordi-
nance for your local region must be
observed. For combustion equipment to
EN 50156-1, the "emergency shut-
down" installed on site must comply with
the requirements of EN 50156-1.
Install the "emergency shutdown" out-
side the installation room; it must be able
to separate all non-earthed conductors
simultaneously with a gap of 3 mm at
least.
We additionally recommend installing an
AC/DC-sensitive RCD (RCD class B
) for DC (fault) currents that can occur
with energy-efficient equipment.
Recommended power cable
3-core cable selected from the following
options:
H05VV-F3G 1.5 mm
2
H05RN-F3G 1.5 mm
2
Installation sequence
Power supply
5600 634 GB
Installation
Page view 98
1 2 ... 94 95 96 97 98 99 100 101 102 103 104 ... 183 184

Comments to this Manuals

No comments