Set-up
9
Transport and Handling only for 120 USG / 450 ltr capacity
Installing panels and insulation
1. Place tank on top of pallet again and
turn 90° to sit across the pallet.
2. Push inner front panel onto tank
housing.
3. Position front panel according to
pencil marks.
4. Push inner rear panel onto tank
housing.
5. Fasten support brackets.
6. Install top panel.
7. Install side panels.
5167 535 v1.3
8.1.
2.
3.
4.
6.
7.
7.
5.
5.
5.
5.
Fig 4.
Installing panels and insulation
Comments to this Manuals